A. Cleats
B. Brackets
C. Bolts
D. All the above
Related Mcqs:
- The weight of an item is measured correct to nearest_________________?
A. 0.25 kg
B. 0.50 kg
C. 0.75 kg
D. 1.00 kg - Pick up the item of work not included in the plinth area estimate______________?
A. Wall thickness
B. Room area
C. W.C. area
D. Courtyard area - The rate of an item of work depends on_________________?
A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. All the above - The following item of earth work is not measured separately ?
A. Setting out of works
B. Site clearance
C. Steps in deep excavation
D. All the above - The item of the brick structure measured in sq.m, is___________________?
A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches - The item of steel work which is measured in sq.m, is_________________?
A. Collapsible gates
B. Rolling shutters
C. Ventilators and glazing
D. All the above - Pick up the correct statement from the following?
A. In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits
B. The earthwork calculation in excavation is made from the difference in levels obtained with a level
C. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
D. All the above - Pick up the correct statement from the following?
A. If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water (F.S.D.)
B. Area of canal in cutting = BD + Sd2 where B = bed width, d = depth of cutting and S is the side slope
C. If F.S.L. is above N.S.L the canal is called partly in cutting and partly in filling and berms are designed as 2d where d is full supply depth
D. All the above - Pick up the correct statement from the following?
A. Bricks are paid per thousand
B. Cement is paid per 50 kg bag
C. Lime is paid per quintal
D. All the above - Pick up the correct statement in case of water supply ?
A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. All the above