A. 70 cm
B. 75 cm
C. 80 cm
D. 90 cm
Related Mcqs:
- period in a septic tank is assumed___________________?
The detention
A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes - The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation - If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is___________________?
A. B + d + Sd
B. Bd + Sd2
C. B × d – Sd1/2
D. ½ (Bd + Sd2) - The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
A. 3250 m3
B. 3225 m3
C. 3275 m3
D. 3300 m3 - The cross -sections for a highway is taken at_________________?
A. Right angle to the centre line
B. 30 metres apart
C. Intermediate points having abrupt change in gradient
D. All the above - Brick walls are measured in sq. m if the thickness of the wall is_________________?
A. 10 cm
B. 15 cm
C. 20 cm
D. None of these - As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above - The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
A. L + 0.42 d
B. L + (2 × 0.42 d)
C. L – (0.42 d)
D. L – (2 × 0.4 d) - The correct Prismoidal formula for volume is________________?
A. D [first area + last area + Even area + 2 odd areas] B. D/3 [first area + last area + 4 Even area + 2 odd areas]
C. D/3 [first area + last area + 2 Even area + 4 odd areas] D. D/6 [first area + odd areas] - For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
A. 0.90 m3
B. 0.94 m3
C. 0.98 m3
D. 1.00 m3