A. B + d + Sd
B. Bd + Sd2
C. B × d – Sd1/2
D. ½ (Bd + Sd2)
Related Mcqs:
- The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
A. 3250 m3
B. 3225 m3
C. 3275 m3
D. 3300 m3 - A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3 - If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above - The cross -sections for a highway is taken at_________________?
A. Right angle to the centre line
B. 30 metres apart
C. Intermediate points having abrupt change in gradient
D. All the above - The area of the cross-section of a road fully in banking shown in the given figure, is________________?
A. [sb² + r² (2bd + sd)²]/(r² – s²)
B. [sb² + r² (2bd + sd)²]/(r² – s5)
C. [sb² + r² (2bd + sd)²]/(r – s)
D. None of these - The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
A. b – rd)²/(r – s)
B. b – rd)²/(r + s)
C. ½ × (b + rd)²/(r – s)
D. b – rd)²/(s – r) - The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500 - The slope of the outlet of ‘P trap’ below the horizontal is kept________________?
A. 8°
B. 10°
C. 12°
D. 14° - The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation - The minimum width of a septic tank is taken__________________?
A. 70 cm
B. 75 cm
C. 80 cm
D. 90 cm