A. useful storage
B. dead storage
C. valley storage
D. surcharge storage
Related Mcqs:
- The useful storage is the volume of water stored in the reservoir between________________?
A. minimum pool level and maximum pool level
B. minimum pool level and normal pool level
C. normal pool level and maximum pool level
D. river bed and minimum pool level - The total capacity of a reservoir is 25 million cubic metres and dead storage is 5 million cubic metres. If the average volume of sediment deposition is 0.10 million cubic metre per year, then the usefulness of the reservoir will start reducing after_________________?
A. 50 years
B. 150 years
C. 200 years
D. 250 years - The ratio of the quantity of water stored in the root zone of the crops to the quantity of water actually delivered in the field is known as__________________?
A. water conveyance efficiency
B. water application efficiency
C. water use efficiency
D. none of the above - A multipurpose reservoir is the one which is_________________?
A. designed for one purpose but serves more than one purpose
B. planned and constructed to serve various purposes
C. both (A. and (B.
D. none of the above - Trap efficiency of a reservoir is a function of_______________?
A. capacity/inflow ratio
B. capacity/outflow ratio
C. outflow/inflow ratio
D. none of the above - When the reservoir is full, the maximum compressive force in a gravity dam is produced______________?
A. at the toe
B. at the heel
C. within the middle third of base
D. at centre of base - For a flood control reservoir, the effective storage is equal to_______________?
A. useful storage – valley storage
B. useful storage + surcharge storage
C. useful storage + surcharge storage + valley storage
D. useful storage + surcharge storage -valley storage - The forces, which are considered for the analysis of an elementary profile of a gravity dam under empty reservoir condition, are________________?
1) Water pressure
2) Self weight
3) Uplift
4) Pressure due to earthquake
The correct answer isA. Only (2)
B. (1), (2) and (3)
C. (1), (2) and (4)
D. (1), (2), (3) and (4) - The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in___________________?
A. aqueduct and syphon aqueduct
B. aqueduct and super passage
C. super passage and canal syphon
D. level crossing - If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be________________?
A. aqueduct
B. superpassage
C. syphon
D. syphon aqueduct