A. a quick method
B. adopted for large surveys only
C. most accurate method
D. suitable for hilly terrains
Related Mcqs:
- In direct method of contouring, the process of locating or identifying points lying on a contour is called_______________?
A. ranging
B. centring
C. horizontal control
D. vertical control - In the cross-section method of indirect contouring, the spacing of cross-sections depends upon_____________?
1. contour interval
2. scale of plan
3. characteristics of ground
The correct answer is ?A. only (1)
B. (1) and (2)
C. (2) and (3)
D. (1), (2) and (3) - The correction for sag is_________________?
A. always additive
B. always subtractive
C. always zero
D. sometimes additive and sometimes subtractive - If the R.L. of a B.M. is 100.00 m, the back- sight is 1.215 m and the foresight is 1.870 m, the R.L. of the forward station is_________________?
A. 99.345 m
B. 100.345 m
C. 100.655m
D. 101.870m - Which of the following errors is not eliminated by the method of repetition of horizontal angle measurement ?
A. error due to eccentricity of verniers
B. error due to displacement of station signals
C. error due to wrong adjustment of line of collimation and trunnion axis
D. error due to inaccurate graduation - The rise and fall method of levelling provides a complete check on_______________?
A. backsight
B. intermediate sight
C. foresight
D. all of the above - Intersection method of detailed plotting is most suitable for________________?
A. forests
B. urban areas
C. hilly areas
D. plains - The horizontal angle between the true meridian and magnetic meridian at a place is called______________?
A. azimuth
B. declination
C. local attraction
D. magnetic bearing - The rise and fall method_______________?
A. is less.accurate than height of instrument method
B. is not suitable for levelling with tilting levels
C. provides a check on the reduction of intermediate point levels
D. quicker and less tedious for large number of intermediate sights - Transit rule of adjusting the consecutive coordinates of a traverse is used where________________?
A. linear and angular measurements of the traverse are of equal accuracy
B. angular measurements are more accurate than linear measurements
C. linear measurements are more accurate than angular measurements
D. all of the above