A. 2%
B. 2.5%
C. 3%
D. 4%
Related Mcqs:
- When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
A. seal coat
B. tack coat
C. prime coat
D. spray of emulsion - For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is_______________?
A. 1 in 30
B. 1 in 36
C. 1 in 48
D. 1 in 60 - The camber of shoulders in water bound macadam roads is________________?
A. equal to the cross slope of pavement
B. less than the cross slope of pavement
C. greater than the cross slope of pavement
D. zero - In case of hill roads, the extra widening is generally provided______________?
A. equally on inner and outer sides of the curve
B. fully on the inner side of the curve
C. fully on the outer side of the curve
D. one-fourth on inner side and three-fourth on outer side of the curve - When a number of roads are meeting at a point and only one of the roads is important, then the suitable shape of rotary is________________?
A. circular
B. tangent
C. elliptical
D. turbine - In hill roads the side drains arc provided________________?
A. only on the hill side of road
B. only on the opposite side of hill
C. on both sides of road
D. none of the above - The minimum design speed for hairpin bends in hill roads is taken as_______________?
A. 20 kmph
B. 30 kmph
C. 40 kmph
D. 50 kmph - The suitable surfacing material for a bridge deck slab is________________?
A. sheet asphalt
B. bituminous carpet
C. mastic asphalt
D. rolled asphalt - Camber in the road is provided for_______________?
A. effective drainage
B. counteracting the centrifugal force
C. having proper sight distance
D. none of the above - The camber of road should be approximately equal to___________________?
A. longitudinal gradient
B. two times the longitudinal gradient
C. three times the longitudinal gradient
D. half the longitudinal gradient