A. sprayed after the aggregates are spread and compacted
B. premixed with aggregates and then spread
C. sprayed before the aggregates are spread and compacted
D. none of the above
Related Mcqs:
- Penetration test on bitumen is used for determining its_____________?
A. grade
B. viscosity
C. ductility
D. temperature susceptibility - For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
A. dry rolling, wet rolling, application of screening and application of filler
B. dry rolling, application of filler, wet rolling and application of screening
C. dry rolling, application of screening, wet rolling and application of filler
D. dry rolling, application of screening, application of filler and wet rolling - The ductility value of bitumen for suitability in road construction should not be less than____________?
A. 30 cm
B. 40 cm
C. 50 cm
D. 60 cm - Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be______________?
A. less-than 40°C
B. greater than 40°C
C. equal to 40°C
D. none of the above - For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is_______________?
A. 1 in 30
B. 1 in 36
C. 1 in 48
D. 1 in 60 - The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is________________?
A. 8 cubic meter
B. 10 cubic meter
C. 12 cubic meter
D. 15 cubic meter - The camber of shoulders in water bound macadam roads is________________?
A. equal to the cross slope of pavement
B. less than the cross slope of pavement
C. greater than the cross slope of pavement
D. zero - Which of the following represents hardest grade of bitumen ?
A. 30/40
B. 60/70
C. 80/100
D. 100/120 - Bitumen of grade 80/100 means______________?
A. its penetration value is 8 mm
B. its penetration value is 10 mm
C. its penetration value is 8 to 10 mm
D. its penetration value is 8 to 10 cm - Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ?
A. mastic asphalt
B. sheet asphalt
C. bituminous carpet
D. bituminous concrete