A. rectangular or block road pattern
B. radial or star and block road pattern
C. radial or star and circular road pattern
D. radial or star and grid road pattern
Related Mcqs:
- When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
A. seal coat
B. tack coat
C. prime coat
D. spray of emulsion - The shoulder provided along the road edge should be_______________?
A. rougher than the traffic lanes
B. smoother than the traffic lanes
C. of same colour as that of the pavement
D. of very low load bearing capacity - When the path travelled along the road surface is more than the circumferential movement of the wheels due to rotation, then it results in______________?
A. slipping
B. skidding
C. turning
D. revolving - If b is the wheel track of a vehicle and h is the height of centre of gravity above road surface, then to avoid overturning and lateral skidding on a horizontal curve, the centrifugal ratio should always be________________?
A. less than b/2h and greater than co-efficient of lateral friction
B. less than b/2h and also less than co-efficient of lateral friction
C. greater than b/2h and less than co-efficient of lateral friction
D. greater than b/2h and also greater than coefficient of lateral friction - The maximum design gradient for vertical profile of a road is______________?
A. ruling gradient
B. limiting gradient
C. exceptional gradient
D. minimum gradient - The camber of road should be approximately equal to___________________?
A. longitudinal gradient
B. two times the longitudinal gradient
C. three times the longitudinal gradient
D. half the longitudinal gradient - Which of the following tests measures the toughness of road aggregates ?
A. crushing strength test
B. abrasion test
C. impact test
D. shape test - The ductility value of bitumen for suitability in road construction should not be less than____________?
A. 30 cm
B. 40 cm
C. 50 cm
D. 60 cm - The maximum limit of water absorption for aggregate suitable for road construction is____________?
A. 0.4 %
B. 0.6%
C. 0.8 %
D. 1.0 % - The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is________________?
A. 8 cubic meter
B. 10 cubic meter
C. 12 cubic meter
D. 15 cubic meter