A. slipping
B. skidding
C. turning
D. revolving
Related Mcqs:
- When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
A. seal coat
B. tack coat
C. prime coat
D. spray of emulsion - On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be_________________?
A. more than the pressure on inner wheels
B. less than the pressure on inner wheels
C. equal to the pressure on inner wheels - If b is the wheel track of a vehicle and h is the height of centre of gravity above road surface, then to avoid overturning and lateral skidding on a horizontal curve, the centrifugal ratio should always be________________?
A. less than b/2h and greater than co-efficient of lateral friction
B. less than b/2h and also less than co-efficient of lateral friction
C. greater than b/2h and less than co-efficient of lateral friction
D. greater than b/2h and also greater than coefficient of lateral friction - The attainment of super elevation by rotation of pavement about the inner edge of the pavement_______________?
A. is preferable in steep terrain
B. results in balancing the earthwork
C. avoids the drainage problem in flat terrain
D. does not change the vertical alignment of road - The diagram which shows the approximate path of vehicles and pedestrians involved in accidents is known as___________________?
A. spot maps
B. pie charts
C. condition diagram
D. collision diagram - Nagpur road plan formula were prepared by assuming______________?
A. rectangular or block road pattern
B. radial or star and block road pattern
C. radial or star and circular road pattern
D. radial or star and grid road pattern - The maximum design gradient for vertical profile of a road is______________?
A. ruling gradient
B. limiting gradient
C. exceptional gradient
D. minimum gradient - Which of the following tests measures the toughness of road aggregates ?
A. crushing strength test
B. abrasion test
C. impact test
D. shape test - The ductility value of bitumen for suitability in road construction should not be less than____________?
A. 30 cm
B. 40 cm
C. 50 cm
D. 60 cm - The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is________________?
A. 8 cubic meter
B. 10 cubic meter
C. 12 cubic meter
D. 15 cubic meter