A. 25 to 50 percent full load
B. 50 to 75 percent full load
C. full load
D. 25 percent overload
Related Mcqs:
- __________ is invariably used for peak load
A. Nuclear power plant
B. Steam turbine plant
C. Pumped storage plant
D. None of the above - Which of the following is the essential requirement of peak load plant ?
A. It should run at high speed
B. It should produce high voltage
C. It should be small in size
D. It should be capable of starting quickly - Large capacity generators are invariably___________?
A. water cooled
B. natural air cooled
C. forced air cooled
D. hydrogen cooled - A pilot exciter is provided on generators for which of the following reasons?
A. To excite the poles of main exciter
B. To provide requisite starting torque to main exciter
C. To provide requisite starting torque to generator
D. None of the above - The load factor of domestic load is usually____________?
A. 10 to 15%
B. 30 to 40%
C. 50 to 60%
D. 60 to 70% - Which of the following plants is almost inevitably used as base load plant?
A. Diesel engine plant
B. Gas turbine plant
C. Nuclear power plant
D. Pumped storage plant - In which’of the following power plants the maintenance cost is usually high?
A. Nuclear power plant
B. Hydro-electric power plants
C. Thermal power plants
D. Diesel engine power plants - For which of the following power plants highly skilled engineers are required for running the plants?
A. Solar power plants
B. Gas turbine power plants
C. Nuclear power plants
D. Hydro-electric power plants - The efficiency of a plant is of least concern when it is selected as___________?
A. peak load plant
B. casual run plant
C. either A. or (b)
D. base load plant - Load curve of a power plant has always____________?
A. zero slope
B. positive slope
C. negative slope
D. All of these