A. January 2004
B. February 2005
C. March 2006
D. April 2007
Related Mcqs:
- When the Pakistan’s commissioner for Indus failure to solve the dispute of Baglihar Dam?
A. June 2003
B. June 2002
C. June 2001
D. June 2000 - Baglihar dam was signed between Jaiparkash industries and:
A. Siemens
B. Hydro industries
C. Both of these
D. None of these - On which river the Baglihar Dam is being constructed
A. Jhelum
B. Chanab
C. Indus
D. none of these - When India signed the project of Baglihar dam?
A. 11 March 1999
B. 11 June 2000
C. 11 April 2001
D. December 2002 - The World Bank appointed a neutral expert to resolve Baglihar dam who is neutral expert?
A. Reamond Laffty
B. Rums John
C. Joh F. Tarren
D. None of these - What is Pakistan’s stand about Baglihar Dam?
A. Pakistan does not agree to any change in treaty
B. Pakistan has accepted India’s proposal of sharing dam’s power
C. Pakistan will accept the dam for the navigation only
D. None of these - Baglihar Dam is located in
A. Srinagar
B. Doda
C. Azad Kashmir
D. Baramola - The Water dispute between Pakistan and India was ended by signing of which treaty?
A. Indus Basin Treaty 1965
B. Indus Water Treaty 1960
C. Indus Basin Treaty 1960
D. Indus Water Treaty 1965 - In which year water dispute emerged from the development of Tulbul Navigational Project by India?
A. 1968
B. 1975
C. 1980
D. 1985 - On 23 September 2011, the arbitral tribunal in the dispute between India and Pakistan ordered interim measures on pending its final decision on the merits of the case over the construction of India’s:
A. Kishanganga Hydroelectric Project
B. Tulbul project
C. Wullar Lake barrage
D. Baglihar Dam