A. weighted costing system
B. average costing system
C. hybrid costing system
D. double costing system
Related Mcqs:
- The variance which is included in absorption costing, but not in variable costing is classified as __________?
A. production volume variance
B. cost volume variance
C. profit volume variance
D. fixed cost variance - The costing technique, which classify all the activities in costing hierarchy is classified as ____________?
A. activity based costing
B. non-financial costing
C. profit costing
D. lump sum costing - In process and job costing system, the normal spoilage cost is considered as ___________?
A. conversion costs
B. sunk costs
C. inventoriable costs
D. non inventoriable costs - If the fixed manufacturing cost expenses are under variable costing and are not expensed in absorption costing, it is resulting in _________?
A. production exceeds breakeven sales
B. breakeven sales exceeds production
C. price exceeds cost
D. cost exceeds price - The normal costing and standard costing methods are used in decisions such as ___________?
A. investment decisions
B. pricing decisions
C. product mix decisions
D. Both B and C - In process costing method, when the work done in current accounting period, and beginning inventory before current accounting period, is classified as _________?
A. partial inventory costing method
B. current period inventory method
C. Last-in, first-out method
D. First-in, first-out method - The forth step in process costing system is to __________?
A. summarize total costs
B. compute cost for each equivalent unit
C. summarize flow of output
D. compute output in units - The first step in process costing system is to ___________?
A. summarize flow of output
B. compute output in units
C. summarize total costs
D. compute cost for each equivalent unit - The fifth step in process costing system is to ___________?
A. allocate separable costs
B. allocate joint costs
C. compute gross margin
D. assign total cost to completed units - The third step in process costing system is to ____________?
A. summarize flow of output
B. compute output in units
C. summarize total costs
D. compute cost for each equivalent unit