A. manufacturing costs incurred
B. variable costs incurred
C. fixed costs incurred
D. actual costs incurred
Related Mcqs:
- The variable overhead flexible budget variance is added to flexible budget amount to calculate _____________?
A. actual cost incurred
B. fixed cost incurred
C. variable cost incurred
D. manufacturing cost incurred - The flexible budget amount is added in to fixed overhead flexible budget variance to calculate _____________?
A. incurred manufacturing
B. incurred production cost
C. actual incurred cost
D. incurred labor cost - If the flexible budget amount is $40000 and variable overhead flexible budget variance is $25000, then actual costs incur will be ____________?
A. $15,000
B. $35,000
C. $65,000
D. $75,000 - If the variable overhead flexible budget variance is $37000 and the flexible budget amount is $10000, then the actual incurred costs would be ____________?
A. $27,000
B. $25,000
C. $47,000
D. $57,000 - If the variable overhead flexible budget variance is $26000 and the flexible budget amount is $15000, then the actual incurred costs will be ________?
A. $21,000
B. $11,000
C. $31,000
D. $41,000 - The flexible budget amount is added to flexible budget variance to calculate
A. static result
B. actual result
C. secondary result
D. primary result - If an actual incurred cost is $387500 and the flexible budget amount is $168750, then fixed overhead variance of flexible budget would be ____________?
A. $518,750
B. $418,750
C. $218,750
D. $318,750 - If the flexible budget amount is $26000 and fixed overhead flexible budget variance is $12500, then actual incurred cost would be ____________?
A. $38,500
B. $48,500
C. $58,500
D. $13,500 - In flexible budget analysis, the variable overhead flexible budget variance is equal to _________?
A. fixed cost-variable budget amount
B. actual cost-flexible budget amount
C. variable cost-allocated amount
D. actual cost-variable amount - The difference between actual variable overhead cost and flexible budget variable overhead amount is termed as __________?
A. overhead flexible budget variance
B. overhead fixed budget variance
C. overhead flexible cost variance
D. overhead flexible price variance