A. direct material costs
B. indirect material costs
C. direct labor costs
D. indirect labor costs
Related Mcqs:
- The conversion cost is $2000 and the manufacturing overhead cost is $7000, then the direct manufacturing labor cost will be _________?
A. $27,000
B. $13,000
C. $130,000
D. $29,500 - If the manufacturing cycle efficiency is 0.725 and the total manufacturing time is 45 minute, then the value added manufacturing time will be _________?
A. 42.625
B. 36.724
C. 32.625
D. 41.625 - If the value added manufacturing time is 65 minutes, the total manufacturing time is 80 minutes, then the manufacturing cycle time will be _________?
A. 0.8125
B. 0.6125
C. 0.9125
D. 1.725 - If the direct material cost is $85000 and direct manufacturing labor is $25000, then prime cost would be _________?
A. $13,500
B. $55,600
C. $60,000
D. $110,000 - The direct manufacturing labor costs is $40000 and manufacturing overhead cost is $7000, then conversion cost would be ____________?
A. $47,000
B. $33,000
C. $57,000
D. $18,000 - The document, which contains the information about the used material sequence, detail and quantity of raw material is classified as __________?
A. bill of materials
B. bill of sequence
C. bill of detail
D. bill of raw materials - The budgeted fixed manufacturing cost is divided by budgeted fixed manufacturing cost per unit to calculate : __________?
A. fixed material price
B. variable materials price
C. fixed production units
D. budgeted production units - The fixed budgeted manufacturing cost is $45000 and the budgeted production units are 900, then budgeted fixed manufacturing cost per unit will be ____________?
A. $200
B. $150
C. $50
D. $100 - If the fixed budgeted manufacturing cost is $35000 and the budgeted production units are 7000, then budgeted fixed manufacturing cost per unit will be ___________?
A. $20
B. $5
C. $10
D. $15 - If the budgeted annual manufacturing indirect cost is $2250000 and the cost allocation base is 2800 labor hour, then budgeted manufacturing overhead rate will be ___________?
A. $803.571 per labor hour
B. $805 per labor hour
C. $905 per labor hour
D. $802 per labor hour